MCP.so
ログイン
CImanual

Ship PR Until Green

Implement on a branch, run tests, push, open a PR, wait for CI, and loop until checks pass and the PR is ready to merge.

起動プロンプト

Start the "Ship PR Until Green" loop.

Goal: PR is open with all CI checks passing
Max iterations: 10
Between iterations run: gh pr checks
Exit when: all PR checks are success

Step 1: Implement the change, test locally, push, open PR, and fix CI until green.

Self-pace this loop. After each iteration, run the check command, read the output, and only continue if the exit condition is not met. Stop when the exit condition passes or max iterations is reached. Give a short status update each pass.

基本情報

カテゴリ

CI

目標

PR is open with all CI checks passing

最大反復回数

10

検査コマンド

gh pr checks

退出条件

all PR checks are success

対応エージェント

Claude Code, Cursor

手順

  1. 1

    Implement and test

    Make the scoped change and run local tests.

    npm test
  2. 2

    Commit and push

    Commit with a clear message and push the branch.

  3. 3

    Open or update PR

    Open a PR with summary and test plan, or update existing PR.

    gh pr view --json statusCheckRollup,url
  4. 4

    Fix CI

    If CI fails, read logs, fix once locally, push, and re-wait.

他のCIのループ