MCP.so
Sign In
CImanual

Ship PR Until Green

Implement on a branch, run tests, push, open a PR, wait for CI, and loop until checks pass and the PR is ready to merge.

Kickoff prompt

Start the "Ship PR Until Green" loop.

Goal: PR is open with all CI checks passing
Max iterations: 10
Between iterations run: gh pr checks
Exit when: all PR checks are success

Step 1: Implement the change, test locally, push, open PR, and fix CI until green.

Self-pace this loop. After each iteration, run the check command, read the output, and only continue if the exit condition is not met. Stop when the exit condition passes or max iterations is reached. Give a short status update each pass.

Basic information

Category

CI

Goal

PR is open with all CI checks passing

Max iterations

10

Check command

gh pr checks

Exit when

all PR checks are success

Supported agents

Claude Code, Cursor

Steps

  1. 1

    Implement and test

    Make the scoped change and run local tests.

    npm test
  2. 2

    Commit and push

    Commit with a clear message and push the branch.

  3. 3

    Open or update PR

    Open a PR with summary and test plan, or update existing PR.

    gh pr view --json statusCheckRollup,url
  4. 4

    Fix CI

    If CI fails, read logs, fix once locally, push, and re-wait.

More CI loops